Iranian attacks damaged two Kuwaiti power and water desalination plants over the weekend, placing huge strain on the emirate’s already fragile power sector. The attacks came as Kuwait grappled with temperatures in excess of 45°C and any blackouts or water shortages could have had a devastating impact. Power outages have so far been kept to a minimum.
All told, there were three attacks on two plants over 17-18 July, forcing the Ministry of Water, Electricity and Renewable Energy (MEWRE) to disconnect generating units to conduct repairs and ensure grid stability. The ministry also called on residents to reduce electricity consumption during peak hours (11:00-17:00) to ease pressure on the grid. (CONTINUED – 821 WORDS)
Read this article for free
Gain access to over 60-years of energy analysis and news
-
Delve into the details backed by data
-
Exclusive information from high-level officials
-
Assess future risks and opportunities

