Gas flows through the 8bcm/y (775mn cfd)-capacity Greenstream pipeline linking Libya and Italy resumed on 27 April following two weeks of scheduled maintenance. Operator Mellitah Oil and Gas, a joint venture between NOC and Italy’s Eni, confirmed the resumption of flows.
The pipeline was shut for 13 days for a “complete overhaul” of offshore ‘Area D’ (previously Block NC-41), and work on key infrastructure, including the offshore Sabratha platform and the onshore Mellitah industrial complex. (CONTINUED – 712 WORDS)
Read this article for free
Gain access to over 60-years of energy analysis and news
-
Delve into the details backed by data
-
Exclusive information from high-level officials
-
Assess future risks and opportunities

